The Beginning Of the Pinkwhale Club Magic Hotel Renovation Project

by pinkwhaleclub

/https://rumble.com/v1kjzy4-the-beginning-of-the-magic-hotel-renovation-constructiontips-buildyourownho.html?mref=1ekzuf&mc=dshhd/

 

After the Balayo Off-Grid project You can find videos on my TikTok channel: https://www.tiktok.com/@pinkwhaleclub ), we spent a few months living in a cave, learning to trade, and doing some self-development until we found out what next. 

 

…and one day we found something…:

 

“A couple is needed to renovate and run a hotel”…. Sounds nice! 🙂

 

Our first meeting with the owner was exciting. He offered us (me) a 2 months trial period with a part-time contract (22h/week),  and after “I proved my skills” I’ll get a full-time contract (40h/week), of course with accommodation. Leti, my girlfriend will do the cleaning tasks at the beginning only 1 day per week and as she is needed, later she will do the bookings, administration, etc. 

 

We were told by the owner, our ‘boss’ that they have been seeking a couple who could take care of this project for the long term. 

 

For me, it seems like a nice thing to do!  I can build a resort on the beach, no rush… At the same time, I can continue building the Pinkwhale Club, creating educational content on the construction, going deeper into crypto, trading, etc. 

 

However, there are a few questions occurring on the way: 

-how fast I can get this job done when I’m allowed to work only 4 hours a day, 

-what is my assurance against me finishing the job during the trial period and I will not be sent away, making a fool out of myself…etc ??? 

 

After the trial, we suppose to get full-time contracts. 

The deal seems ok regardless of the red flags. 

You can have a look on the Pinkwhale Club YouTube or TikTok videos, the surrounding is insane. I like the project, and I feel very enthusiastic about it as a challenge to build it on my own.

 

I started the renovation in august of 2022. 

 

The buildings were abandoned for a long time and now the owner wants to renovate all and open a resort. 

 

I love this project, and the place this hotel is located. We are in Tenerife, Spain, right next to the Playa De Burro, a fantastic place in the Canary Islands in the Atlantic Ocean!

 

I want to do this! 😀

 

However, this story seems to be too good to be true. This forever-green saying is really actual these times.

 

Finally, I got offered a part-time contract with undefined end part-time, the additional staff is very funny, I couldn’t even renovate the place if I sign it as “I’m not allowed to make modifications on the property…”  

 

…totally ridiculous… 

 

Building State Analysis 

 

The first building has 7 rooms next to each other with windows facing the Atlantic Ocean. 

The structure is a bit ‘second-hand’, the walls are cracking, the building is sinking, and the concrete roof is also needed attention due to the broken sections and rusty metal rods sticking out of it. 

After finishing our bedroom, the plan is to continue with the corridor. 

 

About 40m/1,3m, the wall 2,75m, and the roof is about 0,8m making a total of 3,5m height of the surface. … I’ll have a lot of stuff to do… 😀

 

After the corridor, I continue with the rooms and when I have t

he opportunity, I’ll fix the road also. 

 

Stay with me to show You how I make this place a fantastic, one-of-a-kind Magic Hotel! 

 

Follow the process on the Pinkwhale Club social media, (TikTok, YouTube, Instagram, and now on Rumble and Locals as well…)

 

…and maybe in a few weeks You can come and enjoy this beauty with us! 

Written by pinkwhaleclub

Changing the World together !!!

Website: https://pinkwhaleclub.com

Leave a Reply

Your email address will not be published.
*
*

Translate »